Difference between revisions of "Air calibration"
From Bioblast
(created page) Β |
m |
||
Line 1: | Line 1: | ||
Air calibration is together with zero calibration one of the two steps of the [[POS calibration]], see [[http://www.oroboros.at/index.php?id=o2k-o2calibration MiPNet12.08]]. It is done at [[open chamber]] after zero( +/- 1 pmol (s ml)) has been achieved. Unlike [[zero calibration]] but like the [[stirrer]] | Air calibration is together with zero calibration one of the two steps of the [[POS calibration]], see [[http://www.oroboros.at/index.php?id=o2k-o2calibration MiPNet12.08]]. It is done at [[open chamber]] after zero( +/- 1 pmol (s ml)) has been achieved. Unlike [[zero calibration]] but like the [[stirrer test]], air calibration should be done before each experiment (and does not take any extra time). | ||
See [Raw signal]] for the signal to expect during Air calibration. | See [Raw signal]] for the signal to expect during Air calibration. | ||
{{#set:Technical service= POS calibration}} | {{#set:Technical service= POS calibration}} | ||
__SHOWFACTBOX__ | |||
{{Technical service}} | {{Technical service}} |
Revision as of 15:34, 21 September 2010
Air calibration is together with zero calibration one of the two steps of the POS calibration, see [MiPNet12.08]. It is done at open chamber after zero( +/- 1 pmol (s ml)) has been achieved. Unlike zero calibration but like the stirrer test, air calibration should be done before each experiment (and does not take any extra time). See [Raw signal]] for the signal to expect during Air calibration.