Difference between revisions of "O2k-Innovation"
From Bioblast
(Created page with "{{OROBOROS_header_page_name}} :::: <big><big>A project in progress</big></big> == Tyrolean Government grant == right|350px * The project ...") |
|||
Line 13: | Line 13: | ||
== Development of the NextGen-O2k: a look inside == | == Development of the NextGen-O2k: a look inside == | ||
::: Different stages of prototype development: The NextGen-O2k is becoming more and more packed with two spectrofluorometers, two spectrophotometers, light guides, Peltier temperatue | ::: Different stages of prototype development: The NextGen-O2k is becoming more and more packed with two spectrofluorometers, two spectrophotometers, light guides, Peltier temperatue control with new heat pipes, microelectronics. | ||
<gallery mode=default perrow=2 widths="500px" heights="300px"> | <gallery mode=default perrow=2 widths="500px" heights="300px"> |
Revision as of 10:13, 12 June 2015
O2k-Innovation
- A project in progress
Tyrolean Government grant
- The project NextGen-O2k is supported by the "Technologieförderungsprogramm - Tiroler Innovationsförderung" of the Tyrolean Government.
- Project duration: 2015-02-01 to 2017-01-31.
- Partners: OROBOROS INSTRUMENTS, WGT Elektronik, software security networks.
- Application: 2015-01-30; Granted: 2015-03-24 (total budget € 350.000).
- Funding: € 140,000 plus a bonus of € 5,000 for the implementation of gender sensitive actions.
Development of the NextGen-O2k: a look inside
- Different stages of prototype development: The NextGen-O2k is becoming more and more packed with two spectrofluorometers, two spectrophotometers, light guides, Peltier temperatue control with new heat pipes, microelectronics.