Cookies help us deliver our services. By using our services, you agree to our use of cookies. More information

Difference between revisions of "Talk:Management Committee MitoEAGLE"

From Bioblast
Line 3: Line 3:
== MC Committee e-VOTES ==
== MC Committee e-VOTES ==


:::: In accordance with the COST rules:
:::# Β» [[MC MITOEAGLE e-VOTE 01]]
::::* The vote starts now and will remain open for 7 days.
:::# Β» [[MC MITOEAGLE e-VOTE 02]]
::::* Conflicting votes cast by MC Members representing the same country will constitute a void vote unless the conflict is resolved before the end of the voting period.
::::* Absence of casting a vote will be considered as a vote β€žYESβ€œ.
Β 
:::: After the end of the voting period, the outcome of the vote will be communicated by email.
Β 
Β 
=== 2016-10-20 e-VOTE 02 ===
:::: We would like to ask you for your e-VOTE by return email (send to the Chair; Email: [email protected]) on the following two topics:
Β 
==== Topic (1) MITOEAGLE flyer ====
Β 
:::: The production of a flyer/folder and poster for dissemination purposes of our MITOEAGLE project is included in Grant Period 1 with 2,700.- EUR.
:::: The Core Group discussed a specific offer of Impact Ltd to produce a 4-page flyer/leaflet, to be completed by March 2017 within the limits of our budget (without poster). Details and comments from the Core Group (and from another COST Action) to this offer are summarized here:
::::Β» http://www.mitoglobal.org/index.php/Talk:MITOEAGLE_flyer
:::: A decision should be made by end of October, if we want to go ahead with this option.Β 
:::: I ask you to vote whether the offer by β€œImpact Ltd” should be accepted or not.
****: Topic (1) vote YES (agreed) or NO (not agreed).
Β 
==== Topic (2) Training School in Obergurgl, Tyrol/Austria in July 2017 ====
:::: In cooperation with the [http://www.bioblast.at/index.php/Mitochondrial_Physiology_Society Mitochondrial Physiology Society] a Training School will be organised in Obergurgl in 2017 July 23–30. A reservation had to be made in advance. The Medical University Innsbruck will provide some financial support. Training Schools are an essential COST networking tool. The MiP''school'' falls into Grant Period 2, and the MC Meeting in Barcelona is too late for taking a decision: In this advance e-VOTE we ask you about your opinion to organize the 2017 July 23–30 event as '''MiP''school'' 2017 – MITOEAGLE Science Camp'''. The structure is proposed as follows, with 70-120 participants at day 1-5, and 40-60 at day 5-8:
:::::* '''Day 1'''. Arrival training schoolΒ 
:::::* '''Day 2-4. Training school MiPsociety and MITOEAGLE''': Day 2-3: Intoductory lectures on the mitochondrial electron transfer system (ETS), coupling of electron transfer to proton translocation and phosphorylation (OXPHOS), mitochondrial pathways, respiratory protocols for diagnosis of mitochondrial function, mitochondrial respiratory control in health and disease. Day 4: Scientific lectures and student presentations.
:::::* '''Day 5'''. Departure school, arrival MITOEAGLE workshop, relaxing day for overall-participantsΒ 
:::::* '''Day 6-7. MITOEAGLE Workshop''': WG1-4.
:::::* '''Day 8'''. Departure MITOEAGLEΒ 
****: Topic (2) vote YES (agreed) or NO (not agreed).
Β 
::::β€’ The vote starts now and will remain open for 7 days (until 2016-10-27, ##:## CET).
Β 
:::: Best regards, [[Gnaiger E |Erich]]
Β 
Β 
=== 2016-10-10 e-VOTE 01 ===
:::: We would like to ask you for your e-VOTE by return email (send to the Chair; Email: [email protected]) on the following two topics:
Β 
==== Topic (1) Verona meeting ====
:::: Adjustment of the flat rateΒ  The Work & Budget Plan for Grant Period 1 (2016-11-01 to 2017-04-30) has now been approved by our Management Committee. For the final calculation, the flat rate for accommodation was revised to an amount of EUR 95.00 per night for the November meeting in Verona (β€œA roadmap for MITOEAGLE and first steps”). Approval by the Management Committee is now required for this revised flat rate.
****: Topic (1) vote YES (agreed) or NO (not agreed).
:::: '''2016-10-18 Outcome e-VOTE 01, Topic 1''':
::::# Email votes received: 34
::::# Votes YES (including absences of casting a vote): 53
::::# Votes NO: 0
::::# '''Country ('Party') votes APPROVED: 29'''
::::# Country ('Party') votes REJECTED: 0
::::# Country ('Party') votes: VOID: 0
::::# Country not yet represented by an MC member: Slovakia
Β 
==== Topic (2) Implementation of specific plans to increase the involvement of Early Career Investigators and for maintaining and monitoring gender balance ====
:::: Comment of the Scientific Committee (MITOEAGLE COST-Evaluation 2016-02-12): β€žThe proposed Action must develop and implement specific plans to increase the involvement of Early Career Investigators and for maintaining and monitoring gender balance.β€œ
:::: We suggest to implement the following strategies as part of the specific plans to increase the involvement of Early Career Investigators and for maintaining and monitoring gender balance:
::::: (a) Encourage the COST National Coordinators of any new party (COST country) joining during the Action to consider Early Career Investigators and gender balance in their nominations as new Management Committee Members.
::::: (b) Encourage the COST National Coordinators of COST countries represented in the Action to support initiatives of established MC members to rotate in exchange of Early Career Investigators and to consider gender balance in replacement nominations.
****: Topic (2) vote YES (agreed) or NO (not agreed).
:::: '''2016-10-18 Outcome e-VOTE 01, Topic 2''':
::::# Email votes received: 34
::::# Votes YES (including absences of casting a vote): 50
::::# Votes NO: 3
::::# '''Country ('Party') votes APPROVED: 27'''
::::# Country ('Party') votes REJECTED: 1
::::# Country ('Party') votes: VOID: 1 (country with conflicting votes of the two MC members)
::::# Country not yet represented by an MC member: Slovakia
Β 
::::β€’ The vote starts now and will remain open for 7 days (until 2016-10-17, 16:30 CET).
Β 
:::: Best regards, [[Gnaiger E |Erich]]


== Core Group ==
== Core Group ==

Revision as of 16:05, 20 October 2016

MC Committee e-VOTES

  1. Β» MC MITOEAGLE e-VOTE 01
  2. Β» MC MITOEAGLE e-VOTE 02

Core Group

The Core Group is typically composed of the Action Chair, Vice Chair, Grant Holder Scientific Representative, WG Leaders, STSM and TS coordinators and any other horizontal role (i.e. about 10-12 persons). The CG meets to take decisions on behalf of the MC (if the CG has the formal mandate to do so by the MC), and otherwise to steer the Action and submits a list of decisions for the MC to approve. It is not compulsory to have a CG, especially in smaller Actions.
A CG meeting is therefore useful during a GP in addition to the compulsory MC, to (re)define the Action’s activities, in particular when there is budget under- or over-spending. - Dr. Federica Ortelli (COST Science Officer) (2016)