Cookies help us deliver our services. By using our services, you agree to our use of cookies. More information

Difference between revisions of "Zero calibration"

From Bioblast
(created page)
Β 
m
Line 11: Line 11:
* when a new [[POS connector]] is used
* when a new [[POS connector]] is used


{{#set:Technical service= POS calibration}}
{{#set:Technical service=POS calibration}}


__SHOWFACTBOX__
__SHOWFACTBOX__


{{Technical service}}
{{Technical service}}

Revision as of 07:47, 24 September 2010

Zero calibration is together with air calibration one of the two steps of the POS calibration, see [MiPNet12.08]. It is done at closed chamber after all the oxygen has been removed by the addition of dithionite. A zero calibration is the last part of the sensor test and described in detail there. Unlike air calibration it is not necessary to perform a zero calibration each day.

A zero calibration should be performed

A zero calibration has to be performed

  • when a new or serviced POS is used for the first time
  • when a new membrane was applied to the sensor
  • when the gain is changed
  • when a new POS connector is used



Template:Technical service

... more about "Zero calibration"
POS calibration +